A modular partition system ships as a kit: panels, posts, rails and hardware in one or two pallets or crates. The panels are the largest and most visible part, and they are usually the only part that cannot be replaced from stock at the destination.
Why panels lead the damage list
Panels are the biggest surface and the least protected, because the posts and rails are rigid and the panel edge is not. In a mixed crate the panel edge is what the rail lands on.
A replacement panel is a lead-time problem on site, so panel damage stops an installation rather than delaying it.
Specification at a glance
Panel thickness sets the channel, and length follows the crate rather than the panel, because the panels sit inside a frame.
| Contact | Protection | Note |
|---|
| Rail on panel edge | U channel | Hard on soft |
| Bottom edge in crate | Wider leg | Panel weight |
| Panel to panel | Flat strip | Separation |
| Crate frame | None needed | Band crosses frame |
| Site handling | Keep channels on | Until hung |
Mixed crates and internal separation
The useful rule is that hard parts do not touch panel edges. Rails and posts get wrapped or bagged, and the panel edges get the channel; where the two must sit together, a flat strip between them does the separating.
Panels standing on edge in a crate put their weight on the bottom edge, so that edge needs the wider leg and the heavier wall in the pack.
Bands, crates and the site handover
Crate bands cross the frame, not the panel, so the job of the protector is internal rather than at the band. Getting that wrong wastes a profile on a frame that does not need it.
Where the crate is opened on site and panels are carried in, keeping the channels on until the panel is hung is the cheapest protection available.
Questions buyers ask before ordering
Why do panels get damaged in a kit?
The rigid rails and posts land on the panel edge, which is the softest part of the pack.
Is the band a problem?
Not usually, because crate bands cross the frame rather than the panel.
What about the bottom edge?
Panels standing on edge carry their weight there, so it needs the wider leg.
How do you stop rail and panel touching?
Bag the rail, channel the panel, and put a flat strip between them if they must sit together.
Should channels stay on at site?
Yes, until the panel is hung; it is the cheapest protection there is.
For a quotation, post the panel size, the band positions and the destination port to mona@hengnicepacking.com.