Cost per meter is the only figure that lets two edge protector quotes be compared, and it is also the figure most often quoted without saying what is in it. Board weight, wall thickness, cut length and packing all move the number, and a quote that does not state them cannot be checked against another.
Board weight and wall
The board is most of the cost. A heavier paper grade and a thicker wall both add material per meter, and they add it in a straight line, so a 5 mm wall is not a small step up from a 3 mm one in cost terms.
That is why the specification should be challenged before the price is negotiated: a wall that is thicker than the duty requires is the most common way to overpay for edge protection.
Cut length and the cutting cost
Cutting is priced per piece as well as per meter. A 2,000 mm length and a 400 mm length cut from the same board carry different cutting cost per meter, because the short piece needs more cuts to make a meter of protection.
This is the reason a per-meter price for two different lengths is not comparable, and it is worth asking for both figures separately.
| Driver | Effect on cost per meter | How to control it |
|---|
| Board grade | Higher grade, higher cost | Match grade to duty |
| Wall thickness | Straight line increase | Do not over-specify |
| Cut length | Shorter cuts cost more per meter | Order the length you use |
| Print | Plate plus run | Print one face only |
| Packing | Volume and labour | Dense, flat pack |
| Freight | Per meter landed | Compare packed volume |
Packing, freight and the landed number
Bundles, cartons, labels and pallet pattern all change the freight volume. A cheaper profile packed loose can cost more landed than a slightly dearer one packed flat and dense.
For an export order the landed comparison should include the freight per meter, which is where a dense pack beats a bulky one.
How to compare two quotes
Ask each supplier for the same four lines: board grade, wall, cut length and packing unit, with a per-meter figure for each length you actually buy. If one quote cannot be broken down that way, the comparison is a guess.
Questions buyers ask before ordering
What is a typical price per meter?
It depends on board, wall and cut length. Any single figure would be misleading without those.
Why is a short cut dearer per meter?
Because the cutting cost per piece is spread over less length.
Does print change the price much?
It adds a plate and a print run, so it matters more at low volume.
Should I compare landed cost?
Yes, especially for export, where packed volume decides freight per meter.
How do I check a quote?
Ask for board grade, wall, cut length and packing unit with a per-meter figure for each length.
For a quotation, post the product size, the band positions and the destination port to mona@hengnicepacking.com.